Repair and scaffolding 2026
Since 8 October 2026 the Ulitsa Serafimovicha camera is live again: part of the scaffold came down. From 2 June until that day the mesh blocked the view. Capital repair is planned to finish next year.
Since 8 October 2026 the Ulitsa Serafimovicha camera is live again. Until then, from 2 June, it was off: scaffolding stood on the facade, and mesh covered the square, the canal and the Kotelnicheskaya high-rise.
On 8 October part of the scaffolding came off the House on the Embankment. After the facade renovation, some of the scaffold was taken down. The result of the work is visible now. Capital repair of the building is planned to finish next year. The Serafimovicha camera is live again.
Below is the “Serafimovicha repair” album, June through 8 October: scaffold, old paint coming off, whitewash, the grey facade, two clips shot on a phone. There are no old-stream screenshots in this set; if they turn up, they go in a separate “before” block.
What the weeks show
Early June. Scaffolding is already up. On 13 June the square is visible from the camera spot only through the mesh — that is why the streams are offline, not some abstract “maintenance”.
July. Old paint is stripped, a hoist hangs on the facade. On 19 July a crane sits by neighbouring works; there is a short clip from the road. By the end of the month the building is fully netted from the square.
August. On the 8th a giant hard hat for the 70th Builder’s Day floats on the canal — accidental, and on-theme. By the 15th a new white facade is up, windows still in film. On the 18th part of the wall is already grey, people work from a cradle. On the 24th a wrapped unit comes off the facade; by the 26th the cradle sits on the grey wall.
September. By the 4th the middle facade from the square is already grey, scaffold left at the edges. On the 9th the windows are without film. On the 2nd “Moscow 879” flags stand by Udarnik. On the 7th the GES-2 steps look onto a new footbridge in the canal — toward Maly Kamenny and Repin Garden; that is a different worksite, not the facade.
October. On the 2nd a hoist stands on the grey facade, part of the scaffold still in mesh. On the 3rd a crane is by the house: a cradle on the boom above the roof, and a dome in mesh beside it. On the 8th part of the scaffold came down: the grey facade is open, and the camera shows the street again.
The page stays as the chronicle. Capital repair of the building is planned to finish next year.
This is not a municipal report and not a mos.ru construction diary. A personal view from Yakimanka.
Phone video
Photos by date
Full album →

Notes as work goes on
September 2026: grey facade and a footbridge in the canal
By 9 September the middle of the Serafimovicha house is grey, windows without film. From the GES-2 steps a new footbridge is visible in the …
Read →Repair and scaffolding 2026: opening the facade chronicle
Since 8 October 2026 the Ulitsa Serafimovicha camera is live again. Below is the 20 August note, when the stream was still off for …
Read →